Banner Image

Category Archives: toyota production system (2)

Happy Hollow Lean

Today is a favorite holiday for me, full of make-believe supernatural and candy, and unencumbered for the most part by significance. For this..
This entry was posted in old lean dude, lean manufacturing, six sigma, continuous improvement, GBMP, Toast Kaizen, kaizen, toyota production system, operational excellence on October 31 , 2017.

Tools or Culture?

With our annual Northeast LEAN Conference just a few days away, I want to relate a personal story about the theme of this year’s conference, The..
This entry was posted in old lean dude, TPS, lean manufacturing, kanban, continuous improvement, kaizen, 7 wastes, Changeover, SMED, toyota production system, shigeo shingo, enterprise excellence on September 14 , 2017.

Lean Society

“All animals are equal, but some animals are more equal than others.” This quote from George Orwell’s political allegory, Animal Farm, occurred to..
This entry was posted in lean, old lean dude, lean manufacturing, six sigma, continuous improvement, shingo model, Manager, process, toyota production system, Knowledge Worker, operational excellence on July 21 , 2017.

The Final Frontier

On May 5, 1961, Alan Shepard became the first US astronaut to journey to the “final frontier.” Atop a Mercury rocket, Shepard launched into a..
This entry was posted in old lean dude, TPS, lean manufacturing, six sigma, continuous improvement, shingo model, lean thinking, Shingo Institute, lean in healthcare, toyota production system, Lean Culture on June 05 , 2017.

Babel

I grew up in a small manufacturing company where nine different languages were spoken. English was the language of managers, office workers and some..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, shingo prize, ESL, toyota production system on March 20 , 2017.

Cartwheels

Most often when we think of a wheel, it’s in the context of transportation, one of the more obvious and ever-present of the 7 wastes. In fact, the..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, 7 wastes, toyota production system, shigeo shingo, eoq on January 31 , 2017.

Back To The Future

Here is an article I wrote ten years ago, recently resurrected from the lost letter file. I can’t remember why I wrote it or for whom. Originally..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, GBMP, Toast Kaizen, TPS. oldleandude, kaizen, bruce hamilton, toyota production system on December 22 , 2016.

How to Rework a Charlie Brown Tree

Last weekend, as I forked over $70 for a “live” Christmas tree, I had a flashback to a very different experience when I was still a kid. My family..
This entry was posted in old lean dude, lean manufacturing, GBMP, creativity, toyota production system on December 21 , 2016.

A few of my favorite....books

During a recent Tea Time with The Toast Dude webinar, I shared a few of my favorite books. These are the books that I recommend to students of Lean..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, toyota production system, operational excellence on December 06 , 2016.

Caramel Corn Kaizen

Holiday shopping last week at one of my favorite food places, Johnson’s Popcorn, I came upon a scene reminiscent of our Lean training video Toast..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, VSM, kaizen, popcorn, toyota production system on December 01 , 2016.

Subscribe to receive new blog posts via email.

Looking for something specific?