Banner Image

Category Archives: lean manufacturing (7)

Back To The Future

Here is an article I wrote ten years ago, recently resurrected from the lost letter file. I can’t remember why I wrote it or for whom. Originally..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, GBMP, Toast Kaizen, TPS. oldleandude, kaizen, bruce hamilton, toyota production system on December 22 , 2016.

How to Rework a Charlie Brown Tree

Last weekend, as I forked over $70 for a “live” Christmas tree, I had a flashback to a very different experience when I was still a kid. My family..
This entry was posted in old lean dude, lean manufacturing, GBMP, creativity, toyota production system on December 21 , 2016.

A few of my favorite....books

During a recent Tea Time with The Toast Dude webinar, I shared a few of my favorite books. These are the books that I recommend to students of Lean..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, toyota production system, operational excellence on December 06 , 2016.

Caramel Corn Kaizen

Holiday shopping last week at one of my favorite food places, Johnson’s Popcorn, I came upon a scene reminiscent of our Lean training video Toast..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, VSM, kaizen, popcorn, toyota production system on December 01 , 2016.

Doormats

One of Shigeo Shingo’s popular status quo targets was engineers, whom he placed in three categories: Table engineers—those who just sit around a..
This entry was posted in old lean dude, lean manufacturing, six sigma, continuous improvement, lean engineer, toyota production system, design for assembly, shigeo shingo on September 23 , 2016.

Summer Memory

I was lucky that the first boss I ever had (at age 13) had much to teach at a point when I had much to learn. Chris M. was a brilliant but illiterate..
This entry was posted in old lean dude, lean manufacturing, GBMP, Toast Kaizen, kaizen, lean conference, toyota production system on September 16 , 2016.

Lean By Doing

Early along, as a student of the Toyota Production System (TPS), now referred to as “Lean,” I struggled with some of the concepts and systems. For..
This entry was posted in old lean dude, lean manufacturing, kaizen, 5S, toyota production system, shigeo shingo on September 07 , 2016.

Space Junk

Last weekend in the Nantucket ferry terminal, I passed a defunct phone booth, the ornate wooden kiosk kind that was used twenty years ago to frame a..
This entry was posted in old lean dude, lean manufacturing, Toast Kaizen, northeast lean conference, 5S, idea systems on August 24 , 2016.

Peripheral Discoveries

The following post is inspired by The Teachings of Don Juan, an anthropological novel from the 1960’s written by Carlos Castaneda chronicling his..
This entry was posted in old lean dude, lean manufacturing, GBMP, kaizen, toyota production system, shigeo shingo, value stream mapping on August 16 , 2016.

Profitless Part Proliferation

I wrote a post a little more than five years ago about Variety Reduction Program (VRP), an amazing but little known product design optimization tool...
This entry was posted in old lean dude, TPS, lean manufacturing, GBMP, Toast Kaizen, kaizen, hoshin kanri, true north, poka-yoke, toyota production system, inventory, shigeo shingo, value stream mapping on June 27 , 2016.

Subscribe to receive new blog posts via email.

Looking for something specific?