Banner Image

Category Archives: continuous improvement (6)

Systems Tinking

At GBMP’s launch of the Shingo Institute’s BUILD EXCELLENCE workshop, it occurred to me that perhaps systems thinking might be more aptly named..
This entry was posted in old lean dude, lean manufacturing, six sigma, continuous improvement, shingo model, lean thinking, Lean Culture on May 30 , 2017.

Babel

I grew up in a small manufacturing company where nine different languages were spoken. English was the language of managers, office workers and some..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, shingo prize, ESL, toyota production system on March 20 , 2017.

Cartwheels

Most often when we think of a wheel, it’s in the context of transportation, one of the more obvious and ever-present of the 7 wastes. In fact, the..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, 7 wastes, toyota production system, shigeo shingo, eoq on January 31 , 2017.

Back To The Future

Here is an article I wrote ten years ago, recently resurrected from the lost letter file. I can’t remember why I wrote it or for whom. Originally..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, GBMP, Toast Kaizen, TPS. oldleandude, kaizen, bruce hamilton, toyota production system on December 22 , 2016.

A few of my favorite....books

During a recent Tea Time with The Toast Dude webinar, I shared a few of my favorite books. These are the books that I recommend to students of Lean..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, toyota production system, operational excellence on December 06 , 2016.

Caramel Corn Kaizen

Holiday shopping last week at one of my favorite food places, Johnson’s Popcorn, I came upon a scene reminiscent of our Lean training video Toast..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, VSM, kaizen, popcorn, toyota production system on December 01 , 2016.

Lean Wizards

October was Lean conference month for me: First our own Northeast Lean Conference in Worcester (pronounced “Wustah”), then the international AME..
This entry was posted in lean, old lean dude, TPS, six sigma, continuous improvement, lean thinking, Toast Kaizen, Toyota Production System. Lean manufacturing, kaizen, 5S on October 31 , 2016.

Doormats

One of Shigeo Shingo’s popular status quo targets was engineers, whom he placed in three categories: Table engineers—those who just sit around a..
This entry was posted in old lean dude, lean manufacturing, six sigma, continuous improvement, lean engineer, toyota production system, design for assembly, shigeo shingo on September 23 , 2016.

Traditional Lean?

Twice in the last month I’ve heard the phrase “Traditional Lean” used in public presentations. In neither case did the presenter explain the..
This entry was posted in old lean dude, TPS, lean manufacturing, six sigma, continuous improvement, GM, automation, MRP, toyota production system, lean sigma, ERP on May 31 , 2016.

Bump and Grind

Here’s a personal reflection from my distant past, but which might still be a current state for some of you. When I began working in manufacturing..
This entry was posted in old lean dude, lean manufacturing, continuous improvement, lean thinking, Deming, lean leadership, toyota production system, lead times on February 24 , 2016.

Subscribe to receive new blog posts via email.

Looking for something specific?