Banner Image

Summer Memory

I was lucky that the first boss I ever had (at age 13) had much to teach at a point when I had much to learn. Chris M. was a brilliant but illiterate..
This entry was posted in old lean dude, lean manufacturing, GBMP, Toast Kaizen, kaizen, lean conference, toyota production system on September 16 , 2016.

Lean By Doing

Early along, as a student of the Toyota Production System (TPS), now referred to as “Lean,” I struggled with some of the concepts and systems. For..
This entry was posted in old lean dude, lean manufacturing, kaizen, 5S, toyota production system, shigeo shingo on September 07 , 2016.

Space Junk

Last weekend in the Nantucket ferry terminal, I passed a defunct phone booth, the ornate wooden kiosk kind that was used twenty years ago to frame a..
This entry was posted in old lean dude, lean manufacturing, Toast Kaizen, northeast lean conference, 5S, idea systems on August 24 , 2016.

Peripheral Discoveries

The following post is inspired by The Teachings of Don Juan, an anthropological novel from the 1960’s written by Carlos Castaneda chronicling his..
This entry was posted in old lean dude, lean manufacturing, GBMP, kaizen, toyota production system, shigeo shingo, value stream mapping on August 16 , 2016.

Consult with Humility

A friend and colleague remarked to me recently “You know the Lean market has become mature,” implying a depth and breadth of Lean understanding in..
This entry was posted in old lean dude on July 11 , 2016.

Profitless Part Proliferation

I wrote a post a little more than five years ago about Variety Reduction Program (VRP), an amazing but little known product design optimization tool...
This entry was posted in old lean dude, TPS, lean manufacturing, GBMP, Toast Kaizen, kaizen, hoshin kanri, true north, poka-yoke, toyota production system, inventory, shigeo shingo, value stream mapping on June 27 , 2016.

Traditional Lean?

Twice in the last month I’ve heard the phrase “Traditional Lean” used in public presentations. In neither case did the presenter explain the..
This entry was posted in old lean dude, TPS, lean manufacturing, six sigma, continuous improvement, GM, automation, MRP, toyota production system, lean sigma, ERP on May 31 , 2016.

Eye of the Beholder

Many moons ago when I was just getting started on my lean journey, I visited a large automotive supplier to benchmark pull systems. My own factory..
This entry was posted in old lean dude, TPS, lean manufacturing, kanban, GBMP, Toast Kaizen, kaizen, TPM, 5S, true north, poka-yoke, toyota production system, shigeo shingo, value stream mapping on May 20 , 2016.

Indefinite Postponement

Today’s post is inspired by the politically charged gobbledygook we call presidential primaries. This battle of principles turned battle of wills..
This entry was posted in old lean dude, lean manufacturing, GBMP, Toast Kaizen, kaizen, hoshin kanri, true north, toyota production system, shigeo shingo, value stream mapping on April 20 , 2016.

Ten Posts for Ten Shingo Principles

Hurrah! Today is the first day of Spring, if a little snowy, in the Boston area. And the 28th Annual Shingo Prize Conference is fast approaching in..
This entry was posted in old lean dude, lean manufacturing, GBMP, Toast Kaizen, Lean Principles, Shingo Institute, kaizen, shingo prize, bruce hamilton, toyota production system, Guiding Principles on March 21 , 2016.

Subscribe to receive new blog posts via email.

Looking for something specific?