Early along, as a student of the Toyota Production System (TPS), now referred to as “Lean,” I struggled with some of the concepts and systems. For example, Shigeo Shingo’s claim that a four-hour machine setup could be reduced to less than ten minutes made me a skeptic.
“Perhaps,” I thought, “when Mr. Shingo talked about SMED, single minute exchange of dies, he was referring only to machinery in which the changeover involved die changes. CNC Lathes were different, I rationalized; no chance for single minute changeover there.”
I kept these doubts to myself although I believe the machine operators had similar doubts. We’d made modest setup improvements, but nothing like Shingo was suggesting. Anything beyond low-hanging fruit took us too far out of our comfort zone.
In 1996 however, when a consultant from TSSC, a division of Toyota, began working with us, it quickly became apparent to me through her questioning that our doubts arose from ‘conceptual blind spots’ developed through old setup practices. These were preventing us from seeing a multitude of improvement opportunities. With some priming from our consultant, we found waste in areas where, as Mr. Shingo would say, “it was thought not to exist.” Under the guidance of our TSSC consultant, our well-ingrained existing frameworks for analyzing problems were gradually un-learned as part of our Lean learning.
Over a four-month period, focusing on sixty-six parts that ran on one CNC lathe, setups were reduced first from an hour to thirty minutes, then twenty and finally to eight minutes for any changeover between any two parts. At that point the operators began measuring the setups in seconds.
The impact this had on our operation was truly revolutionary. An abstract understanding that we had gained from reading Shingo’s book was now replaced by a tacit learning that could only have come through guided discovery and continual practice: Learning by doing or, in this case, “Lean By Doing.”
There are two morals to this story:
GBMP has chosen the “Lean-by-doing” theme for its 12th annual Northeast Lean Conference and in doing so we have invited some the most hands-on practitioners and experts to share their tacit learning with every participant. Over half of our sessions will be hands-on learning. The event gets under way in 26 days and registration is still open at www.northeastLEANconference.org. Hope to see you there.
O.L.D.